Fiber-cement shifer (slate) line — engineering, delivery, and commissioning

Modern asphalt production line — engineering, delivery, and commissioning
Location
Samarkand region
Production capacity
80 t/soat
Timeline
40 days
Engineers on site
2





The Vericore Global team selected, delivered, and commissioned equipment for a modern asphalt concrete plant in the Samarkand region.
The client needed to quickly launch a high-capacity, energy-efficient asphalt plant to meet regional road construction demand.
We analyzed production volumes, specified the equipment line, managed logistics and customs clearance, then installed the plant and trained operators on site.
Asphalt mixing plant, drying drum, mineral filler batcher, bitumen tank, and automated control system.
The plant launched on schedule, producing 3,200 tonnes in the first month with 15-month warranty service started.
Get a free consultation — we will size the line and prepare a commercial proposal.

Tashkent region
Fiber-cement shifer (slate) line — engineering, delivery, and commissioning
A manager will call you within 15 minutes