
2026
Shifer Zavod
Tashkent region
Fiber-cement shifer (slate) line — engineering, delivery, and commissioning
35 daysView project
Automated brick production line
Location
Samarkand region
Daily output
120 000 dona
Timeline
38 days
Engineers on site
2
Turnkey brick line — engineering, delivery, and commissioning.
Modernize the existing shop and cut energy use.
Line configuration, logistics, and on-site tuning.
Press, drying conveyor, control panel.
Output rose 28% with improved worker safety.
Get a free consultation — we will size the line and prepare a commercial proposal.

Tashkent region
Fiber-cement shifer (slate) line — engineering, delivery, and commissioning

Samarkand region
Modern asphalt production line — engineering, delivery, and commissioning
A manager will call you within 15 minutes