Shifer Zavod
Tashkent region
Fiber-cement shifer (slate) line — engineering, delivery, and commissioning
Full-cycle concrete plant — engineering, delivery, and commissioning
Location
Tashkent, Yunusabad district
Production capacity
60 m³/soat
Timeline
45 days
Engineers on site
2
The Verikore Global team selected, delivered, and commissioned an HZS batching plant for a modern concrete production hub in Tashkent.
The client needed to start reliable concrete output quickly and meet demand from the local construction market.
We sized the project, specified an HZS50 line, managed logistics and customs, then installed the plant and trained operators on site.
HZS50 batching plant, JS1000 mixer, PLD1200 batcher, control room, and auxiliary filtration.
The plant went live on schedule, producing over 2,400 m³ in the first month with 15-month warranty service started.
Get a free consultation — we will size the line and prepare a commercial proposal.

Tashkent region
Fiber-cement shifer (slate) line — engineering, delivery, and commissioning

Samarkand region
Modern asphalt production line — engineering, delivery, and commissioning
A manager will call you within 15 minutes